technology
Technology | Specifications |
---|---|
Heating & cooling | • Manufacturing halls and warehouses: 3 heat pumps (geothermal) & 3 backup gas condensing boilers installed in adjacent energoboxes • Main office building: 3 heat pumps (geothermal), 2 gas condensing boilers, chiller and a desk exchanger |
Hot water | • Manufacturing halls via electric boilers installed in built-in service rooms • Main office building: hot water tanks heated by gas boilers |
Electricity generation | • Rooftop mounted photovoltaic powerplant with capacity of about 1 MWp to be installed in 2023, possibly including battery storage |
Electricity distribution | • A local distribution network operated by the owner of the park • The total reserved power capacity is currently 4.04 MW and can be further increased • A DC grid is also available |
Gas distribution | • Connected to high pressure gas distribution grid (VTL) • The gas boilers (in energoboxes) are connected via medium pressure grid (STL) |
Water supply and wastewater | • Connected to the public drinking water grid • Own water tower to maintain required water pressure (mainly for fire safety requirements) • Own sewage water treatment plant • Greywater system ready for use (for sanitary facilities and watering) |
Lighting | • LED lights with Digital Addressable Lighting Interface DALI, Em ≤ 500 lx, controlled via KNX system |
Internet connection | • Optical cable connected to the Building A and distributed further, 1 GB capacity • A wireless internet antenna installed on the water tower |
EV charging | • Main parking lot equipped with a 50 kW EV charger, additional installation of chargers is possible • A power connection ready for e-bus charging |
Security | • 24 hour security, electronic building security system, CCTV system, fire alarm station, electronic fire alarm system |
Other | • 2 meteostations (air quality monitoring, precipitation monitoring etc.) |
A
building A
administration, accommodation, technical and sanitary rooms
B
building B
manufacture
C
building C
warehouse
D
building D
manufacture
E
building E
manufacture
F
building F
manufacture
retention reservoir
sewage water treatment plant
possible further construction area
energobox
energobox
energobox
diesel generator set, main transformer, gas regulation station, automatic water pressure station
power connection ready for e-bus charging
water tower
charging station for EVs
control room, energobox for building A, substation (incl. DC), datacente
photovoltaics to be installed on roofs